Claremont High School Student Center

Client: Claremont Unified School District
Market: K-12 Education
Discipline: Architecture + Interiors
Project Area: 13,000 sq. ft.

The new 13,000 square foot Student Center for Claremont High School will sit in the heart of the campus and will replace a literal ’hodge-podge’ of existing buildings. The Student Center will house a variety of student-focused functions including food service, conference space, classrooms, labs, and a tall volume second floor multipurpose room.

The pad steps down over eight feet across the length of the new building but must maintain connections to a variety of existing circulation patterns that crisscross through the site. The design team is using this opportunity to create a variety of student gathering patios. 

Currently under construction, the New Student Center will become the visual focal point of the campus as being funded entirely from CUSD’s November 2016 General Obligation Bond.

Client: Claremont Unified School District

Share this story

Client: Claremont Unified School District
Market: K-12 Education
Discipline: Architecture + Interiors
Project Area: 13,000 sq. ft.

Claremont High School Student Center

The new 13,000 square foot Student Center for Claremont High School will sit in the heart of the campus and will replace a literal ’hodge-podge’ of existing buildings. The Student Center will house a variety of student-focused functions including food service, conference space, classrooms, labs, and a tall volume second floor multipurpose room.

The pad steps down over eight feet across the length of the new building but must maintain connections to a variety of existing circulation patterns that crisscross through the site. The design team is using this opportunity to create a variety of student gathering patios. 

Currently under construction, the New Student Center will become the visual focal point of the campus as being funded entirely from CUSD’s November 2016 General Obligation Bond.

Client: Claremont Unified School District