The pad steps down over eight feet across the length of the new building but must maintain connections to a variety of existing circulation patterns that crisscross through the site. The design team is using this opportunity to create a variety of student gathering patios.
Currently under construction, the New Student Center will become the visual focal point of the campus as being funded entirely from CUSD’s November 2016 General Obligation Bond.
Client: Claremont Unified School District