The AN4 scope includes the encapsulation of all interior surfaces with new paint and sealers. Construction of the open office space includes conference rooms, break rooms, cafeteria, satellite communications rooms (SCR), data center space, document control rooms, multi-purpose rooms and miscellaneous support spaces.
The infrastructure was altered by replacing existing chillers, providing new air handling units and associated control systems, air distribution system, installation of a new switch and UPS equipment, modification of existing fire protection system, life safety system, and the installation of new security, power/ telecom distribution systems. The scope also included the purchase and installation of power poles for owner provided Teknion modular furniture.